| Theoretical productivity(m3/h) | 60 |
| Discharge height(m) | 3.9 |
| Concrete mixer | MEO1500/1000 |
| Theoretical production cycle(s) | 60 |
| Aggregate bin capacity (m3) | 2×12 |
| Belt conveying capacity (t/h) | 320 |
| Screw conveyor maximum conveying capacity (t/h) | 40 |
| Total power (kW) | 80 |
| Aggregate weighing range and accuracy (kg) | (500-2500)±2% |
| Cement weighing range and accuracy (kg) | (100-600)±1% |
| Water weighing range and accuracy (kg) | (40-250)±1% |
| Additive weighing range and accuracy (kg) | (5-20)±1% |
Recently, our independently developed HZSY60 mobile concrete batching plant was successfully delivered to a customer in Mongolia. It will provide 24/7 concrete production support for local transportation artery construction, demonstrating Chinese equipment’s robust capabilities in extreme cold desert conditions.
Innovative Features Conquer Harsh Environments:
Rapid Relocation & Agile Deployment
Integrated full-trailer design enables “whole-plant towing” for quick transfer. Ready for immediate operation at new sites without disassembly, fundamentally solving equipment mobilization challenges in Mongolia’s vast, sparsely populated terrain.
Extreme-Cold Installation & Sandstorm Resistance
Modular pre-assembled structure improves installation efficiency by 200%. Equipped with a -25°C anti-freeze hydraulic system and three-stage dust filtration, confronts Mongolia’s severe winter cold and spring sandstorms.
Intelligent Control & Precision Quality
IoT-enabled PLC system monitors aggregate moisture content in real-time and dynamically adjusts mix proportions. Ensures concrete strength standard deviation ≤0.5MPa even in unattended operation.
The Mongolian customer praised at the -25°C trial run: “It adapts to the steppe climate better than Mongolian horses! Completing installation in 3 days and commissioning on the same day sets a new plateau construction record!”
As the plant commences operation near Ulaanbaatar, this steel fortress is helping accelerate the China-Mongolia Economic Corridor construction with a pouring capacity of 1 cubic meter per minute.